Letter To The Editor – Chris B
On the 29th of May 2023, our local member demonstrated yet again that he fails to understand the importance and the reasoning behind the Borumba pumped hydro scheme.
Mr O’Brien noted his opposition to the project based on the impact of transmission lines on the environment and members of the local community.
Failing to understand environmental impacts, Mr O’Brien utilised his platform to recommend nuclear power instead!
On cost alone, nuclear power represents over five times the lifetime costs of pumped hydro and solar, as costed by the CSIRO in 2022.
Not to mention the exorbitant costs associated with nuclear waste handling, decommissioning the sites, or that nuclear plants are required to shut down for maintenance periodically.
He also failed to mention that transmission lines would still need to be established at the new site of the reactors.
His increasingly unconstructive and arrogant behaviour during the renewable energy transition boils down to a bad case of ‘not in my backyard’ and political grandstanding.
Mr O’Brien stands yet again in the way of progress for our nation, future jobs and skills for the people of Wide Bay.
– Chris B.
Gympie